Hello, from beautiful St. Barts! This is a dead week for the challenge because my gf is getting married! Her wedding has been postponed twice due to COVID so we are enjoying an amazing little get away. Due to traveling and being OOO I do not have very many updates on the front porch. However, the accesorries are finally starting to show up. It looks like everything should be here on time with the exception of the light that might not get here in time so I may have to improvise.
I mentioned a few weeks ago that I changed the color scheme from green and coral to more of a monochromatic desert pink, so I am going to share with you some of the details from the change.
I still have not decided if I am going to change the door color for a third time so that may still change as well. We are heading back out to Arizona on Friday to finish painting and hang the swing so we shall see what happens with the #pinkdoor.
Only two more weeks left to wrap up this project, yikes! One thing I love about the ORC is that it keeps me on a strict timeline. Without that timeline, there is no way this project would even be close to done in two weeks.
Cheers!
Total Cost Breakdown:
Total Cost: $1,374.47
Operation Curb Appeal To-Do List:
- Paint the rod iron
- Replace the door hardware
- Refresh the doorbell
- Hang the swing
- Install an electrical box where the existing can light is
- Replace the glass in the door
In case you missed it, you can find the previous weeks here:
Don't forget to check out the other Spring ORC participants here!
And for all the behind the scenes follow along on Instagram!